Water pump overhaul for ferry operator

Writer's picture: Graham SykesGraham Sykes

Hot water pumps overhauled for ferry operator.

A leading Swedish ferry operator asked us to overhaul three hot water circulating pumps.


The work involved stripping down the pumps, cleaning and inspecting all parts and testing the stator windings.


Our team also fitted new bearings, shaft seals, a magnetic drive assembly and a gasket set.


It was then time to re-assemble, undergo the final testing and last but not least, paint them. All of the work was carried out within the customer's required time scale.


No matter the type of marine or industrial pump – booster, axial, piston, cavity, screw, process, centrifugal – we can inspect, repair, overhaul and test them up to 20 tonnes in weight.